New Equipment Required Notes

FAA has published a charting notice (PDF) that describes how equipment requirements will be noted on terminal procedure charts. This change is based on a long discussion at the Aeronautical Charting Forum (see 13-02-312: Equipment Requirement Notes on Instrument Approach Procedure).

For procedures with PBN elements, the PBN box will contain the procedure’s navigation specification(s); and, if required: specific sensors or infrastructure needed for the navigation solution; any additional or advanced functional requirements; the minimum Required Navigation Performance (RNP) value and any amplifying remarks. Items listed in this PBN box are REQUIRED. The separate Equipment Requirements Box will list ground-based equipment requirements. On procedures with both PBN elements and ground-based equipment requirements, the PBN requirements box will be listed first.

The publication of the new notes will continue incrementally until all charts have been amended to comply with the new standard.

A sample of the new notes boxes is below.

PBN Requirements Notes

Here’s an example of the requirements box on the recently updated chart for the ILS RWY 28R approach at Billings, MT (KBIL):

KBIL-ILS-PlanView

Advertisements

2 Responses to New Equipment Required Notes

  1. Pingback: An ILS that Requires GPS | BruceAir, LLC (bruceair.com)

  2. Pingback: AIM Updates 28 February 2019 | BruceAir, LLC (bruceair.com)

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: